Asphalt Paving Estimating
Asphalt paving estimates from pavement sections: base course, asphalt tonnage, overlays and striping.
Asphalt Paving Estimating Overview
Asphalt is bought by the ton, and the tonnage depends on area and the thickness of each course in the pavement section. We measure paving areas by section type and convert them into base course volumes and asphalt tons, then add milling, tack coat and markings where specified.
Concrete sidewalks, curbs and pads are covered on our concrete page, so this page stays focused on flexible pavement.
Scope of Work
What Our Asphalt Paving Estimating Covers
Systems, materials and components we measure and price from your project documents.
Paving
- Aggregate base course by area and depth
- Asphalt binder and surface courses in tons
- Milling and overlay of existing pavement
- Patching and full-depth repairs
Surface treatments and markings
- Sealcoating and crack sealing
- Pavement striping, symbols and stop bars
- Wheel stops and signage where specified
What You Receive
- Paving areas by pavement section
- Base volumes and asphalt tonnage
- Striping and marking quantities
- Priced paving estimate
What We Need From You
- Site plan and paving plan with pavement sections
- Striping and signage plan
- Paving specifications and geotechnical recommendations
Projects We Estimate
- Commercial parking lots
- Private roads and driveways
- Parking lot resurfacing
- Industrial yards and truck courts
How It Works
How We Prepare Your Asphalt Paving Estimate
-
Send your plans
Upload drawings, specifications and addenda through the quote form, email or WhatsApp.
-
Confirm scope and fee
We confirm what will be measured, the estimate format and the delivery date before work starts.
-
Takeoff and pricing
Quantities are measured from the drawings, then priced for material, labor and equipment as requested.
-
Review together
We walk you through the estimate, answer questions and adjust it to your bid.
Construction Estimating FAQ
Asphalt Paving Estimating Questions
Curbs and sidewalks are concrete work and are estimated under concrete. We can coordinate both estimates for the same site.
Yes, from a site plan, aerial measurements and the specified overlay thickness. The source of the areas is noted in the estimate.
Related Services
Related Estimating Services
Scopes that are often estimated together with this one.
Get a Free Quote — 24–48 Hour Turnaround
From initial takeoff to final bid, our estimators prepare detailed construction cost estimates for residential, commercial, and industrial projects across the United States.
- 24–48h Typical Turnaround
- All Trades Takeoffs Across CSI Divisions
- Free No-Obligation Quote